Void Engineering ภาษาไทย

Void Engineering work and measured results

Updated

Void Engineering has built data warehouses, dashboards, AI agents and system connections for Thai companies in e-commerce, manufacturing and logistics. Four cases follow. Client names are withheld. Every figure was measured on the client's real data.

Client Industry What was built Measured result
Supplement brand E-commerce Data warehouse, dashboards, business review reports Daily orders job: about 1 hour 25 minutes to 67 seconds
Fertilizer manufacturer Manufacturing SAP Business One warehouse, cost and margin dashboard, chat assistant 98 to 99 percent of items match the ledger to the baht
Freight forwarder Logistics Profit report rebuilt from a legacy system Margin matches on 10,328 of 10,339 jobs
Cement producer Manufacturing One company dashboard Report time: 2 to 3 hours to under 10 seconds

Supplement brand: a warehouse that refreshes every hour

Situation. An online supplement brand sells on several marketplaces and its own web store. Orders sat in an order management system, and reports ran on an older pipeline that took over an hour.

What was built. A data warehouse that replaced the older pipeline, refreshed hourly. Sales dashboards. Weekly and monthly business review reports. A chat assistant for sales questions.

Measured.

  • The daily orders job went from about 1 hour 25 minutes to 67 seconds in the benchmark.
  • In production, the hourly refresh had a median run time of 67 seconds over 58 runs, with no failed run.
  • About 112,000 orders were migrated. Sales and order counts for May 2026 matched the old system to the baht.

Fertilizer manufacturer: costs that tie to the ledger

Situation. A fertilizer manufacturer ran on SAP Business One. Cost and margin by product were worked out by hand.

What was built. SAP Business One data in a warehouse. A cost and margin dashboard. A landed cost calculation. A chat assistant that answers data questions.

Measured.

  • 98 to 99 percent of items match the company's ledger to the baht, across four item groups, for January to June 2026.
  • Cost of goods sold ties to the general ledger within 0.2 percent.
  • A unit error of 1,000 times (kilograms recorded as tonnes) was found in the ERP data.

The company signed a 12-month fractional CTO retainer in September 2026.

Freight forwarder: a report rebuilt from an unsupported system

Situation. A freight forwarder ran its jobs on a system the vendor no longer supported. The profit report depended on an old reporting tool.

What was built. Read-only access to the system's database, and the profit report rebuilt from it.

Measured.

  • Access was live 8 days after kickoff.
  • The rebuilt margin matches the team's own export on 10,328 of 10,339 jobs. The 11 others account for a gap of 0.07 percent.

Cement producer: one dashboard for the company

Situation. Executives waited two to three hours for one company report. Five departments had no shared view of their data.

What was built. One dashboard for the whole company, readable on any device.

Measured.

  • The report went from 2 to 3 hours to under 10 seconds.
  • Five departments got a view of their data for the first time.

Services behind these cases

Contact: sales@voidengineer.ing.